Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 4|回复: 0

Few pics from this week

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 23:52:50 | 显示全部楼层 |阅读模式
Sorry for the pic quality I am not very good at the photo thing.Also forgive the fact that my pics go from start to finish rather quick. I am not very good at rembering to  take pics as things progress hope some day to make posts as good as Zap!Pic 1 and 2 weld up worn key on kabota engineTig weld 200 amps 3/32 steel fillerpic 3 and 4 Crane clutch od worn down had to weld up and turn od. Sorry no pics of the finished job. 110 amps 7018  Tried to stick it because of all the great welds I see on this site I Have been motivated to try and improve my very limited skills.Pic 5 cut out for local masonic lodge done on our cnc plasma cutter. That thing is way cool. Attached Images
Reply:That's quite a variety of projects/customers and welding/cutting techniques - for one week!  Rick V 1 Airco Heliwelder 3A/DDR3 CTC 70/90 amp Stick/Tig Inverters in Parallel1 Lincoln MIG PAK 151 Oxy-Acet
Reply:If I can figure out how to add the rest of the pics I will show the rest.
Reply:Next a phone call "we broke a couple of the bolts in our dozer trackes can you come have a look?The didnt mention the easy outs broken off in the 7/8 in boltsOr that it was on the top of the rock pile Pic 1 The start What a mess!Pic 2 my small portable mill welded to the front roller Pic 3 Bolts Out ready to go back together As I am Putting my gear up I hear a loud Crunch Then...... Attached Images
Reply:This Was the noise Operator ran A wheel loader in to It = broken conveyor.Pic 1 2 and 3 how it looked like when I got there after the belt is cutPic 4 First job to cut it in half so we can safely move it away so We can fix it.Pic 5 In position ready for us to start a fixing. Attached Images
Reply:We moved the two peices together after cutting out the broken sections.Build the pillars out of 3 in sq tube 1/4 wall tube pick up the peices. get it all in a line agian. and tack it up.Real fun will start monday lots of welding and fab will Try to keep the post updated.Hope it was not to bad for a new member. Attached Images
Reply:that is a cool masonic plaque my dad was a mason and i was in DeMolay thought people forgot about the fraternatyLincoln Pro Core 125Lincolin sp 100Miller Big 40Lincoln Idealarc SP250miller matic 212http://www.facebook.com/hdwelding?sk=wallwww.hdweldingbeds.com
Reply:So you cut out the damaged conveyor section then moved it back together so they can get some use till you get the other section healed up again? Sounds a lot better than down time or working straight through hours on end to get them going again. Neat work."The things that will destroy America are prosperity at any price, peace at any price, safety first instead of duty first, the love of soft living and the get rich quick theory of life." -Theodore Roosevelt
Reply:Originally Posted by heimbuckweldingthat is a cool masonic plaque my dad was a mason and i was in DeMolay thought people forgot about the fraternaty
Reply:Originally Posted by dppmfgSorry for not giving a better decription I do not spell very good and hate to type.We Just got the conveyor tacked back together will finish the frame work monday then move the drive pulley and be ready to start moving rock.They already had a extra conveyor at the site it had bad bearing journals on the tail shaft so I air arced the shaft out as it was very stuck and that was faster than taking it back to the shop to use the press. and my trusty 40 lb sledge would not budge it Did not mintion it because I did not have any pics to post the pit owner was rather wound up and probaly would not like me taking pics insted of getting him running agian.Thanks
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-24 16:55 , Processed in 0.096288 second(s), 18 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表