A barrel gettig fabbed up and a pic of a 20 natural getting a sleeve on. line was loaded had a pressure restriction. believe it was at 500 psi........ didnt really read the paper all that great. ha hathe sleeve is the green piece was a 42 inch long doubler sleeve took about 55lbs of weld.not the best pics Attached Images