Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 9|回复: 0

Another lead question

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 22:33:40 | 显示全部楼层 |阅读模式
I just ordered 100' of #1 wire for my bobcat 225 my plans are to cut the 100' in half and have a 50' stinger an 50' ground. Should I cut em 50/50 or make the stinger longer for the situation I cant get my rig close enough to what I am welding on?93 Bobcat 225GMillerMatic 135HF Tig 91811
Reply:if you do cut it longer I wouldnt cut it much longer. I have two 50' sections, and for my stinger I have a tweco with a 12' lighter cable. plus I can always add on and make longer leads as needed. 80' of stinger wont do much good when you only have 20' of ground in most cases- Christian M.C3 Welding & Fabrication - CNC Plasma Cutting-Mobile Welding-Custom welding and fabwww.c3welding.com
Reply:50/50 it is then.93 Bobcat 225GMillerMatic 135HF Tig 91811
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-31 13:33 , Processed in 0.096531 second(s), 18 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表