Structural welders come in

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2022-10-9 15:51:56 | 显示全部楼层 |阅读模式
Got a job thrown in my lap and I don’t do a whole lot of structural steel so I need some of you experts advice . How much time should this take to weld up and how do y’all charge ? I got 64 of these to do the contractor is supplying the materials I cover consumables.

Attached Images


Reply:Personally I hate these threads. IMO if you figure you are going to do the job, know how to bid the job. Seems like the lazy way to go getting others to do your bidding, layout, or whatever. With that being said, I would try to get the parts to make one and multiply from there. Either that or mock up something similar. Charge your hourly rate, factor in consumables and also wear and tear on whatever equipment is to be used.
Reply:I’m not lookin fo a bid , just a time line per pole from someone who does this daily . I’m thinking by the time you cut fit and weld out around 2 hours per pole @ 125$ per hour we’re lookin at 16,000$ . Am I out of line ?
Reply:

Originally Posted by M J D

Personally I hate these threads. IMO if you figure you are going to do the job, know how to bid the job. Seems like the lazy way to go getting others to do your bidding, layout, or whatever. With that being said, I would try to get the parts to make one and multiply from there. Either that or mock up something similar. Charge your hourly rate, factor in consumables and also wear and tear on whatever equipment is to be used.
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-17 07:03 , Processed in 0.173192 second(s), 19 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表