|
|
I posted a little while ago that I started my own business, just a short little update.I ended up landing a small maintenance contract for 2 days work a week at a concrete recycling facility, as well as some work on a construction job, both seem pretty steady for now, so I figured I should invest a bit in some tool's.I already had a small duel cab ute (like a slightly smaller 4 door dodge RAM 1500), and alot of the basic stuff, battery tools, grinders, small stick/TIG welder, hand tools ectSo i went and got a 9KVA generator, a magnetic base drill, a tool box to put on my ute and a nice combo ladder, all stuff that's going to be handy for fixing/building things on site, next purchase is going to be a few folding pipe stands to use a compact portable trestle's, then I think I'll be set for a small mobile fabrication/maintenance setup.I'll get a few pics latter.I want to say thank you to those on here that have encouraged me over the years and answered my stupid questions, the passing of one of the golden oldies on here recently made me realise I wish I'd said it sooner, so thank you all.
Reply:Excellent,keep it goingSent from my LM-X420 using Tapatalk
Reply:I used to charge $40 per hour back in 1990 when I last did a yellow page ad. What is todays going rate mobile sir?
Reply:

Originally Posted by Birmingplumb

I used to charge $40 per hour back in 1990 when I last did a yellow page ad. What is todays going rate mobile sir?
Reply:Ttoks can almost name his price! Yes, he's that good judging by the pics. he's shown. Most would be humbled by his abilities.
Reply:

Originally Posted by ttoks

keep in mind i'm in Australia, so divide this by about 70% to get equivalent in USD.For the construction subcontract work I'm charging $75 plus 10% sales tax just for labour and basic hand tools, they supply all equipment, materials and consumables and PPE.The mobile maintenance contract i'm charging $100 plus sales tax, they supply consumables, materials and heavy equipment (crane hire, tele handler hire ect, or I supply and charge with a markup) and I supply equipment other than heavy machinery, welding machine, generator, drills, mag base, basic PPE ect(they supply anything site specific like LOTO locks) as well as having a 5 hour minimum for planned work (1 hour travel and 4 hour minimum labour), and a call out's/breakdown with short notice it's 8 hour minimum.Both seems pretty good deals to me. |
|