I dont think I would have pulled this anywhere. The customer installed the bolt on - aftermarket hose reels which were surprisingly VERY heavy... this damage is a direct result of the added weight not accounted for in the engenering proccess when determining mtl. thickness. I fabbed a new frame plare as shown as well as added an extra 1/4" plate to both sections. After i removed the tongue and saw its true condition I replaced the factory1/4" wall with a 3/8" wall tube and transfered all other components to the new tube as well as fabbed a new mount at the end. Attached Images
Reply:I'm surprised the original design didn't have the tongue extending farther under the unit to a more 'neutral' location such as the axle centerline or at least closer to it. I guess without the heavy hose reels all would have been OK as you pointed out.Nice fix.MM200 w/Spoolmatic 1Syncrowave 180SDBobcat 225G Plus - LP/NGMUTT Suitcase WirefeederWC-1S/Spoolmatic 1HF-251D-1PakMaster 100XL '68 Red Face Code #6633 projectStar Jet 21-110Save Second Base!