Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 2|回复: 0

Question for Fellow CWI's

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 23:58:39 | 显示全部楼层 |阅读模式
AWS D1.1 welding on hot dipped galvanized steel: what is required?MUST it be removed? 5.15 Preparation of Base MetalSurfaces on which weld metal is to be deposited shall besmooth, uniform, and free from fins, tears, cracks, andother discontinuities which would adversely affect thequality or strength of the weld. Surfaces to be welded,and surfaces adjacent to a weld, shall also be free fromloose or thick scale, slag, rust, moisture, grease, andother foreign material that would prevent proper weldingor produce objectionable fumes. Mill scale that can withstandvigorous wire brushing, a thin rust-inhibitive coating,or antispatter compound may remain with thefollowing exception: for girders in cyclically loadedstructures, all mill scale shall be removed from the surfaceson which flange-to-web welds are to be made.Any other places to support its removal? or places to support is not being removed?
Reply:FB,  Per AWS D1.1 yes it must be removed. The key word is "shall". 5.15 Preparation of Base MetalSurfaces on which weld metal is to be deposited shall besmooth, uniform, and free from fins, tears, cracks and other discontinuities which would adversely affect thequality or strength of the weld. Surfaces to be welded,and surfaces adjacent to a weld, shall also be free fromloose or thick scale, slag, rust, moisture, grease, andother foreign material that would prevent proper weldingor produce objectionable fumes. Mill scale that can withstand vigorous wire brushing, a thin rust-inhibitive coating, or antispatter compound may remain with thefollowing exception: for girders in cyclically loadedstructures, all mill scale shall be removed from the surfaces on which flange-to-web welds are to be made.Also see clause 8.5.1.8.5.1 Base-Metal ConditionBase metal to be repaired and surfaces of existing base metalin contact with new base metal shall be cleaned of dirt, rust and other foreign matter except adherent paint film as perSSPC SP2 (Surface Preparation Specification #2—Hand Tool Cleaning). The portions of the surfaces which will be weldedshall be thoroughly cleaned of all foreign matter including paintfor at least 2” [50 mm] from the root of the weld.jrw159Last edited by jrw159; 02-17-2012 at 02:25 PM.
Reply:I've edited/removed my comment because I realized its not relavent to a CWI.  Sorry, I've started happy hour a little early this friday.Last edited by Chrs; 02-17-2012 at 02:32 PM.
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-24 01:46 , Processed in 0.183199 second(s), 21 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表