Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 6|回复: 0

Live Line Welding Calculations

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 23:32:19 | 显示全部楼层 |阅读模式
I have been searching all day trying to find any hint of guidance on how calculations are performed when making a weld on live lines (ie. Hot Tap Split Tee). I have the API 2201 GP's for Hot Tapping but it doesn't get in to how the calculations are performed. The live line welding that I have performed in the past, the info, UT results, pressures, temp, gas flow etc., were given to an engineer and I in return was given a calc sheet with Heat Input, amps, travel speed, rod size and the welding was completed using these guidlines. So.... where do I find the info on how the calculations were performed? DeepSea5342AWS CWI
Reply:Could you please clarify what do you mean by saying ''welding calculations'' since this normaly expresses the design of the welding including configuration, dimensions, etc
Reply:Take a cpwi class, I believe they cover that in there.
Reply:@ DeepSea5342 - consult page 10 (References) listed in this link:  http://pipingdesign.com/download/hot-tap_procedure.pdf.  No experience in HT ops, but the .pdf steps through "the process.""Discovery is to see what everybody else has seen, and to think what nobody else has thought" - Albert Szent-Gyorgyi
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-26 08:31 , Processed in 0.092985 second(s), 18 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表