Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 8|回复: 0

latest project, platform

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 23:25:47 | 显示全部楼层 |阅读模式
Latest project, a platform for filling the fuel tank at our pumphouse. The 4 cylinder diesel engine is 2' or so above the floor and since it is a fire supply pump it has a whole crapload of regs that have to be followed. Only one that was my concern is the fueltank (inside) has to be a certain height above the fuel transfer pump. Time all was said and done it means the fill for the fuel tank is 10-11' above the ground (outside) which means the poor sob needs a platform to fill it from.It's 8' to the top of the 4' x 4' deck, railing is 42" high made from 1 1/2 x 1 1/2 x 3/16 tubing, platform legs are 2 x 2 x 3/16 tubing,  treads are 1 1/2 x 11 3/4 galvanized grip strut grating, stringers are 10 @ 8 jr stringer channel. Took the stringers off after I took this pick so I can get it dipped. After it's reassembled and installed I'll try and remember to take a final pic.....Mike Attached Images
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-26 23:49 , Processed in 0.070230 second(s), 18 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表