Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 8|回复: 0

Newest work project.

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 22:34:04 | 显示全部楼层 |阅读模式
Some meatball fabrication from yours truly. 4" schedule 40, some MIG, some stick. This is an addition to a pneumatic ore conveyance system. Basically a BIG roots supercharger powered by an electric motor with a venturi setup to draw ore (perlite ore, this grade is the consistency of powdered sugar.) into the air stream. The author in his natural environment...Wye pipes and valves installed...Sent from my iPhone using TapatalkUsing Tapatalk
Reply:More pics...Drop box in place...Existing pipe run to ore bins(I ran the top run about 3 mos ago.)Sent from my iPhone using TapatalkUsing Tapatalk
Reply:Finished Venturi/air feed. Sent from my iPhone using TapatalkUsing Tapatalk
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-30 23:51 , Processed in 0.127972 second(s), 20 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表