Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 1|回复: 0

First Handrail Job-nailed it!

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 22:18:49 | 显示全部楼层 |阅读模式
Took me a while to figure out the dimensions and angle but I think I nailed it!Ed Conleyhttp://www.screamingbroccoli.com/MM252MM211 (Sold)Passport Plus & Spool gunLincoln SP135 Plus- (Gone to a good home)Klutch 120v Plasma cutterSO 2020 benderBeer in the fridge
Reply:Good Job!
Reply:Needs a gusset Dave J.Beware of false knowledge; it is more dangerous than ignorance. ~George Bernard Shaw~ Syncro 350Invertec v250-sThermal Arc 161 and 300MM210DialarcTried being normal once, didn't take....I think it was a Tuesday.
Reply:Did you have help mounting that thing?GravelThe difference between theory and practice is that in theory there is no difference.
Reply:Originally Posted by GravelDid you have help mounting that thing?
Reply:GravelThe difference between theory and practice is that in theory there is no difference.
Reply:It must have taken months of measuring and calculations to achieve such a high degree of success on the first ever try. Nice job, bet your relieved all that work is FINALLY finished, you can now relax knowing it's over with. About those four inspectors, one had to check to be sure it was at the right height from the floor, the second had to insure it was at the correct angle, the third was to make sure it was offset from the wall enough and the fourth to make sure it wasn't off set too much from the wall.  There needs to be one more to come see if it is anchored securely to the wall, so you might not be out of the woods yet.
Reply:Originally Posted by BistineauIt must have taken months of measuring and calculations to achieve such a high degree of success on the first ever try. Nice job, bet your relieved all that work is FINALLY finished, you can now relax knowing it's over with. About those four inspectors, one had to check to be sure it was at the right height from the floor, the second had to insure it was at the correct angle, the third was to make sure it was offset from the wall enough and the fourth to make sure it wasn't off set too much from the wall.  There needs to be one more to come see if it is anchored securely to the wall, so you might not be out of the woods yet.
Reply:I missed the word "rail" when I first read the thread title...Tiger Sales:  AHP Distributor    www.tigersalesco.comAHP200x; AHP 160ST; MM350P,  Spoolmatic 30A; Everlast PowerTig 185; Thermal Dynamics 60i plasma.  For Sale:  Cobra Mig 250 w/ Push-pull gun.  Lincoln Wirematic 250
Reply:Originally Posted by soutthpawI missed the word "rail" when I first read the thread title...
Reply:Originally Posted by lighttekkuYet you opened the thread anyway.
Reply:Nope, you didn't. It needs to have either a volute  or a lambs tongue on each end, or a return to the wall per code, so that it doesn't hang up on clothes? It also needs to extend one tread length beyond the stair in both directions, and remain at the same height above the floor, measured at the tread nose. It should be a stretched Z shape, not straight. It also looks to be 2"+ diameter, the limit for graspability per UbC is 1.5" diameter. You asked for it.Last edited by walker; 10-31-2014 at 07:29 PM.
Reply:Man what did you use to lift it ? No room for a crane. The jobs that men do.
Reply:Originally Posted by BistineauIt must have taken months of measuring and calculations to achieve such a high degree of success on the first ever try. Nice job, bet your relieved all that work is FINALLY finished, you can now relax knowing it's over with. About those four inspectors, one had to check to be sure it was at the right height from the floor, the second had to insure it was at the correct angle, the third was to make sure it was offset from the wall enough and the fourth to make sure it wasn't off set too much from the wall.  There needs to be one more to come see if it is anchored securely to the wall, so you might not be out of the woods yet.
Reply:UPDATE: Owner decided on something more basic!
Reply:Originally Posted by storemanAND, like the ATF, the 5th and 6th guys check and double check to ensure that it is the right address.
Reply:#5 is a woman, good at multi-tasking. 30+ yrs Army Infantry & Field Artillery, 25 yrs agoMiller 350LX Tig Runner TA 210, spool gunLincoln 250/250 IdealArcESAB PCM 500i PlasmaKazoo 30"  vert BSKazoo 9x16 horiz BSClausing 12x24 lathe20T Air Press
Reply:Broccoli1OSHA Safety Orange - nice touch - you can't be too careful with something that doesn't come with an operator's manual.Whenever I build unique projects that has capped ends - I'll throw in a handful of nut and bolts to make noise if the object is ever removed/surplused.  Hand rails are low hanging fruit.The idea: is that curiosity will take over, and it will be cut open when scraped.The nuts and bolts are the lure so the truly 'rarefied' time-capsule contents canbe 'appreciated'.Opus
Reply:Originally Posted by OPUS FERROBroccoli1OSHA Safety Orange - nice touch - you can't be too careful with something that doesn't come with an operator's manual.Whenever I build unique projects that has capped ends - I'll throw in a handful of nut and bolts to make noise if the object is ever removed/surplused.  Hand rails are low hanging fruit.The idea: is that curiosity will take over, and it will be cut open when scraped.The nuts and bolts are the lure so the truly 'rarefied' time-capsule contents canbe 'appreciated'.Opus
Reply:Originally Posted by walkerNope, you didn't. It needs to have either a volute  or a lambs tongue on each end, or a return to the wall per code, so that it doesn't hang up on clothes? It also needs to extend one tread length beyond the stair in both directions, and remain at the same height above the floor, measured at the tread nose. It should be a stretched Z shape, not straight. It also looks to be 2"+ diameter, the limit for graspability per UbC is 1.5" diameter. You asked for it.
Reply:id like to see a skateboarder grind on that suckerNothing Ever Got Done By Quitting, Never Give Up.
Reply:Just in case anyone was worried, no I did not build this awesome handrail Just found it on the ol' interwebs and found it rather amusingEd Conleyhttp://www.screamingbroccoli.com/MM252MM211 (Sold)Passport Plus & Spool gunLincoln SP135 Plus- (Gone to a good home)Klutch 120v Plasma cutterSO 2020 benderBeer in the fridge
Reply:I looks more and more like a HOTDOG just stuck there,the Wienie rail!
Reply:A weenie-wail.  I can hear the music now.  (In my head, can't get it out...)"USMCPOP" First-born son: KIA  Iraq 1/26/05Syncrowave 250 w/ Coolmate 3Dialarc 250, Idealarc 250SP-175 +Firepower TIG 160S (gave the TA 161 STL to the son)Lincwelder AC180C (1952)Victor & Smith O/A torchesMiller spot welder
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2026-1-1 17:50 , Processed in 0.200253 second(s), 20 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表