|
|
Hi guys, my first post here, it is a repeat from no less than one other forum I visit. I took pics, I need to know what would be the best route to frame this thing. They will all be driven by chain and gears. The gear and hub on the lonely roller which will also drive the entire setup is slightly larger as I planned on two driving, then after Surplus Center closed I went to TSC and spent way too much on a hub and sprocket that I have to weld, no big deal, I can line them up. I'm just thinking which would be the most effective givin the blunders I have already created. Should the top single roller be the up and downer, or the twins? I could use either a bottle jack or an ACME screw from a vise, as I have a pile of them, but only one spare ACME nut. I'm at a loss how to proceed. I will attach what I have so far. Attached Images
Reply:This is my ring rollerhttp://www.weldingweb.com/vbb/showthread.php?t=6392
Reply:thanks, I like the open design of your which is like the HF I have, that way I don't have to take anything apart. |
|