|
|
|
(continued from Part 1)Nick Minkema, one of Marks sons, is doing the installation of the boom system.The booms are attached to the wing mounts, with quick disconnect fittings.The steel drop mounting plates have neoprene rubber rest pads, with the boomsfastened to the pads with hose clamps.http://www.weldingweb.com/attachment...1&d=1196042075The main plumbing components are all quickly detachable for cleaning, flushingand removal. The booms fasten to the main pump feed pipe, with cam locks.The end of this feed pipe, has a removable plate for cleaning.The RED DISC seen below, is a no-spill, push to connect fitting for filling the tank; similar to whats used on race cars.http://www.weldingweb.com/attachment...1&d=1196042192http://www.weldingweb.com/attachment...1&d=1196042345Job was discussed and finalized Sat.-June 30--began layout, Sun. 7-1, ordered parts Monday, 7-2, parts arrived Tuesday 7-3, finished job at 10:30 am, Wed. 7-4. Attached ImagesBlackbird |
|