You will need the following 3 parts in addition to the Solenoid/Adapter.You will need TWO couplings. ( shown above)ONE L/H 5/8-18 female /female coupling to connect the water cooler return(red hose) to the short red hose on the solenoid adapter.ONE R/H female/female 5/8-18 coupler to connect the gas hose from the argon tank to the short hose on the adapter/solenoid.ONE 3 ft hose with a male 5/8-18 L/H fitting on each end to connect the gas hose from the cooler to the short hose on the adapter/solenoid water return hose.For top mounting of the cooler on top of the welding machine.For bottom mounting of the cooler you will still need a short water hose to connect the cooler return to the adapter/solenoid water return.Last edited by Donald Branscom; 02-03-2011 at 05:15 PM.AWS certified welding inspectorAWS certified welder
Reply:Originally Posted by Donald BranscomYou will need the following 3 parts in addition to the Solenoid/Adapter.You will need TWO couplings. ( shown above)ONE L/H 5/8-18 female /female coupling to connect the water cooler return(red hose) to the short red hose on the solenoid adapter.ONE R/H female/female 5/8-18 coupler to connect the gas hose from the argon tank to the short hose on the adapter/solenoid.ONE 3 ft hose with a male 5/8-18 L/H fitting on each end to connect the gas hose from the cooler to the short hose on the adapter/solenoid water return hose.For top mounting of the cooler on top of the welding machine.For bottom mounting of the cooler you will still need a short water hose to connect the cooler return to the adapter/solenoid water return.
Reply:[QUOTE=Donald Branscom;468938]You will need the following 3 parts in addition to the Solenoid/Adapter.You will need TWO couplings. ( shown above)ONE L/H 5/8-18 female /female coupling to connect the water cooler return(red hose) to the short red hose on the solenoid adapter.ONE R/H female/female 5/8-18 coupler to connect the gas hose from the argon tank to the short hose on the adapter/solenoid.ONE 3 ft hose with a male 5/8-18 L/H fitting on each end to connect the gas hose from the cooler to the short hose on the adapter/solenoid water return hose.For top mounting of the cooler on top of the welding machine.For bottom mounting of the cooler you will still need a short water hose to connect the cooler return to the adapter/solenoid water return.This is the CORRECT DIAGRAM.AWS certified welding inspectorAWS certified welder
Reply:Make sure to use the DIAGRAM that is marked "CORRECT DIAGRAM" The first two shown were incorrect.Cannot EDIT previous posts unfortunately.AWS certified welding inspectorAWS certified welder