|
|
My second project today was to make a full set of dominoes. I tinkered with it a couple months back and today just decided to do it, a full set. Late in the day I slammed a box together, or whatever a box without a top is called........ to hold the dominoes. It took me 3 hours or so to cut, grind, and drill the dominoes. I put the box together in 15 minutes, including cutting the pieces (I only have an angle grinder).Anyway...... here are some pics of how I spent my Sunday! Attached Images
Reply:Where's the water,JK....looks good.... and creative.Lincoln pro mig 180Lincoln Square Wave Tig 300/wp 20/home built water cooler Victor, Purox, Harris, O/A welding/cutting setupsVintage Craftsman drill pressVintage Craftsman/Atlas 12"x 36'' lathe7''x 12'' w/c band saw Everlast 140 st
Reply:Originally Posted by DemonSpeederWhere's the water,JK....looks good.... and creative.
Reply:Thats funny....Lincoln pro mig 180Lincoln Square Wave Tig 300/wp 20/home built water cooler Victor, Purox, Harris, O/A welding/cutting setupsVintage Craftsman drill pressVintage Craftsman/Atlas 12"x 36'' lathe7''x 12'' w/c band saw Everlast 140 st
Reply:I like it!Real world weldin. When I grow up I want to be a tig weldor. |
|