Got a call to do a job yesterday. Everything that could possibly go wrong, went wrong! We got it done tho. Not sure exactly how it works, just went off what the blueprints stated. It's for a roof exhaust. Just a few pics of the job, and my little helper buddy Tom. We tapped into an A/C line, and used a little miller maxstar, as it was the 9th floor of a building. Only took a few pics, was a frustrating day. Concrete wasn't cut back far enough, beams too long, and wrong size web clips, and only two of us. I'm sore today! We made a few bucks tho  Attached ImagesI hate being bi-polar it's awsomeMy Heroes Have Always Been Cowboys
Reply:I love it when a guy takes chicken **** and makes chicken salad....... You did good.Thanks,HoboLincoln SA200's... at least 15 - 20. They come and go. Growing partial to the "Short Hoods" in my old age. Last count on Short Hoods was 13 in possession.
Reply:Looks like it may have been fun getting those sections up in there.  Manual lifting I presume?Do you know if they intend to re-concrete where they cut it out and/or concrete over your new work?:drinkp: to you both.MM200 w/Spoolmatic 1Syncrowave 180SDBobcat 225G Plus - LP/NGMUTT Suitcase WirefeederWC-1S/Spoolmatic 1HF-251D-1PakMaster 100XL '68 Red Face Code #6633 projectStar Jet 21-110Save Second Base!
Reply:Originally Posted by hobohiltonI love it when a guy takes chicken **** and makes chicken salad....... You did good.Thanks,Hobo
Reply:Originally Posted by duaneb55Looks like it may have been fun getting those sections up in there.  Manual lifting I presume?Do you know if they intend to re-concrete where they cut it out and/or concrete over your new work?:drinkp: to you both.
Reply:Got a call early monday morning for more beam work on another side of the building. Had to be done that day. After a full days work me and my little partner went to the city, and busted our azzes till 1:30 in the morning. Building was dark as sh!t and almost forgot to take pics. I was too miserable to think about it while I was working, pipes and conduit like a Mo Fo! These were the easy to see beams. 4 beams, 16 clips, 48 welds in 9 1/2 hrs. 2 hrs sleep and back to work. Glad to be sitting here drinking a beer!  Attached ImagesI hate being bi-polar it's awsomeMy Heroes Have Always Been Cowboys
Reply:I hate those long work days.But love the result the next.Ranger 305gMillermatic 140 AutosetDewalt Chopsaw2 grindersMy Fists
Reply:It sounds like you had a character building experience!
Reply:Nice work Mike. I have one comment and not to sound like safety police but, where I live, leaving the HILTI clips on the floor is an OSHA violation. Violations were at $2,000 minimum but last week the electrician said the minimum went up to $7,000. That includes spent clips because who leaves new clips on the floor?
Reply:Originally Posted by InsanerideNice work Mike. I have one comment and not to sound like safety police but, where I live, leaving the HILTI clips on the floor is an OSHA violation. Violations were at $2,000 minimum but last week the electrician said the minimum went up to $7,000. That includes spent clips because who leaves new clips on the floor?
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-27 16:55 , Processed in 0.094783 second(s), 19 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表