Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 6|回复: 0

Tough conditions

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 23:06:39 | 显示全部楼层 |阅读模式
Chilled water air handler,. Remove foam rock insulation,. Schedule 40 black pipe has some wear,. 15 years wear, worse case , can a flange be welded on to add new valve,. Using a maxstar 150 stick.? Thx for repliesKILL THE TERROISTLOOK NOW THEY R
Reply:Lol wutYou didn't build that.'85 Miller AEAD-200LE
Reply:Should not be a problem with a slip on flange. Could be an issue with a weld neck. Can you access the inside and back weld it?Lincoln SA200's... at least 15 - 20. They come and go. Growing partial to the "Short Hoods" in my old age. Last count on Short Hoods was 13 in possession.
Reply:Thx hobohilton , thats probably the route I'm gonna take , Love this site http://www.engineersedge.com/fluid_f...chedule-40.htmHelping me with pipe sizes as well., I'm not trying to advertise for theses folks jet to let u guys know!!!Last edited by milkyway; 08-20-2012 at 11:24 PM.KILL THE TERROISTLOOK NOW THEY R
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2025-12-28 06:19 , Processed in 0.103814 second(s), 20 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表