Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 10|回复: 0

Structural job

[复制链接]

9万

主题

9万

帖子

29万

积分

论坛元老

Rank: 8Rank: 8

积分
293221
发表于 2021-8-31 22:08:13 | 显示全部楼层 |阅读模式
'Recent job i did 2 MC channels 1-10"25lb/ft 14' long spliced to a 18' 12' 40lb/ft.Both havea 10"x3/8"thk. flat welded to bottom.Installed 3"x3"hss under middle at splice.And another on end.All thru bolted with 12" carriage bolts.Columns had 5/8" top and bottom plates.Bottom had 5/8"x6" kwik anchorbolts. Attached Images
Reply:Ahh thats not a fun job i want to see more of your machine repairs lol.But love the work you do. ive done a few welding jobs in someones house they make more nervous then when im cutting into someones 100k boat.High Octane Welding
Reply:Originally Posted by abecAhh thats not a fun job i want to see more of your machine repairs lol.But love the work you do. ive done a few welding jobs in someones house they make more nervous then when im cutting into someones 100k boat.
Reply:Originally Posted by abecAhh thats not a fun job i want to see more of your machine repairs lol.But love the work you do. ive done a few welding jobs in someones house they make more nervous then when im cutting into someones 100k boat.
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|小黑屋|DiscuzX

GMT+8, 2026-1-2 18:31 , Processed in 0.108268 second(s), 20 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表